LPG High-Speed Centrifugal Spray Dryer For Whole Milk

  • >=1 Sets
    $45,000.00
Model Number:
LPG-100
Lead Time:
Quantity(Sets) 1 - 3 >3
Est. Time(days) 30 Negotiable
Customization:
Customized logo (Min. Order: 1 Sets)
Report Suspicious Activity
Overview
Quick Details
Type:
Spray Drying Equipment
Application:
Medicine Processing, Chemicals Processing, Food Processing
Condition:
New
Place of Origin:
Jiangsu, China
Brand Name:
Macat
Voltage:
220-380V
Power:
81000
Dimension(L*W*H):
5200mm*3500mm*6700mm
Certification:
ISO
Key Selling Points:
Flexible Manufacturing
Warranty:
Unavailable
After Warranty Service:
Online support
Applicable Industries:
Manufacturing Plant, Food & Beverage Factory, Farms, Restaurant, Food Shop, Food & Beverage Shops
Local Service Location:
None
Showroom Location:
None
Product name:
LPG High-Speed Centrifugal Spray Dryer For Whole Milk
Model:
LPG-100
Usage:
Food Used
Fuel:
Electrical Heater
Inlet Air Temperature:
140-350℃
Outlet Air Temperature:
80-90℃
Evaporation:
100kg/h
Rotary speed of atomizer:
18000rpm
Diameter of atomizing disc:
120mm
Power product recovery rate:
95%
Supply Ability
Supply Ability:
10 Set/Sets per Month
Packaging & Delivery
Packaging Details
Container ,wooden
Port
Shanghai Port
Picture Example:
package-img
package-img
Lead Time :
Quantity(Sets) 1 - 3 >3
Est. Time(days) 30 To be negotiated
Product Description
Centrifugal spray dryer is the most widely used process in liquid shaping technology. It is suitable for producing power and
granules solid products from solution, emulsion, soliquoid, and pumpable paste materials. So when the particle size, final
moisture, bulk density and granules shape meet the accurate standard, centrifugal spray drying is a ideal drying process.
Model
LPG-100
Atomizing way
High speed centrifugal atomizer
81Elecrtrical heating power
81KW
Powder product recovery rate
About 95%
Outlines
1. Atomization: Atomizing system must insure fogdrops distributing unifoemly
2. Contact of hot airflow and fogdrops: When enough hot air enter into drying tower, the flow way and angle have to considered, no
matter co-current flow, adverse current or mixed flow, must insure the sufficient heat exchange, it is cruicial.
3. The angle design of pipelines and cone: It is very important to select the suitable angle, here we would like to share our
experience from production of thousands of this equipments.
Features
1. Drying speed is fast.
2. The product has good degree of homogeneity, fluidity and solubility.
3. Production pocess is simple and operation is easy to control.
4. Adops mechanical type centrifugal atomizer, driven by gear, speed is stable and can ensure the uniform distribution of
forgdrops.
5. The direction and angle of hot air distributor adopt adjustable structure, it can ensure the forgdrop contact with hot air
fully.
6. Elbow is made of sanitation degree steel pipe, it can avoid the material blocked in the elbow.
Application
1.Foodstuff:
Amino acid, vitamin, egg powder, bone powder, flavouring, protein, milk powder, blood powder,soy sauce powder, coffee, tea powder,glucose, pentadiene carboxylic acid, pectin, flavours, vegetable juice, yeast, starch, etc.
2.Ceramic:
Alumina, zirconia, magnesium oxide, titania, pottery clay, china clay, all kinds of magnetic porcelain and metal-oxides, etc.
3.Chemical:
Aluminium polychlorid, disperse dyes, reactive dyes, organic catalyzer, white carbon black, washing powder, zinc sulfate, silica,sodium metasilicate, potassium fluoride, calcium carbonate, potassium sulfate, ingotganic catalyzer and all kinds of waste liquid,etc.
Product Parameters
Related Products
Sketch of Flow Chart
FAQ
Q1: When can I get the price quotation ?
A1: We can send you the quotation within 24 hours after your inquiry , including the shipping cost if you need . Chat with us by
Alibaba Trade Manager or directly send inquiry to our email .

Q2: What about payment term ?
A2: 100% by T/T; 40% as deposit, 60% balance before delivery.

Q3: How many about MOQ?
A3: MOQ is 1 unit.

Q4: What about the delivery?
A4: 45 working days after receiving deposit.

Q5: How about your delivery time?
A5: Generally, it will take 15 to 60 days after receiving your down payment. The specific delivery time depends on items and
quantity of your order.

Q6: Do you test all your machine before delivery?
A6: We realize that the quality is the first priority for running our business and each equipment could be inspected before
leaving factory.